top of page
Image by Jilbert Ebrahimi

Smart waste management

Anker 1

Benefits

Waste container tracking

Waste container tracking achieves optimisation of emptying times, route management and use of resources in all areas. The infrastructure is used optimally, the vehicles are only sent on the route where they are really needed and, in addition, waste container management reduces the environmental impact.

Value Proposition

Those who do waste container tracking see the full potential for improvement through better time management and resource planning. This also benefits people and the environment in terms of sustainable waste management.

Compliance with labels and certificates

Energy controlling makes compliance with labels and certificates easily achievable. 

Optimized route planing

Smart waste management calculates a forecast based on the current fill levels and experience data.

Benchmarking

Plan investments based on data thanks to benchmarking

Environmental action

IoT enables intelligent waste disposal management, where the fill levels of containers are monitored remotely and collection only takes place when they are full.

Stunning reports

Stunning reports that inspire and make data exciting

Transparency

Smart waste management is integrated into the management processes, enabling order and quick access to generated waste data.

Perfect integration between edge and cloud

Through smart waste management, the current fill levels of the waste containers can be monitored in real time and forecasts can be made for route planning and emptying times through empirical values using IoT. This monitoring can be completely remote-controlled, so that the collection only has to take place when it is necessary. The intelligent waste management can be integrated into the administrative processes, so there is no need for additional human resources or new software.

waste container tracking.PNG

Waste container tracking implemented in six steps

With our six-step process flow, you will always be accompanied by our team from the problem to the optimal solution.

Walk-trough documents

Input

Customer inquiry

Kickoff

Inspection planning

Material Electrical installation manual

Measurement concept, Documentation Finished, electrical installation

Output

Inital data 
collection

Documentation Measurement concept

Documentation Measurement concept

Labeling Provision of devices Functioning setup

Construction work completed Equipment installed on site

Acceptance protocol Last update measurement concept

Configuration backend
& devices

Electrical installation

Commissioning + plausibility check

Planning installation

Inspection

Kickoff

Success Stories

Read our blog entries and let yourself be inspired by the projects we have already implemented and the experiences we have made. 

Are you ready for waste container tracking?

 

bottom of page